Jump to content

California State Route 125

Route map:
This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia

State Route 125 marker
State Route 125
Map
SR 125 highlighted in red
Route information
Maintained by Caltrans and SANDAG
Length22.302 mi[1] (35.892 km)
Tourist
routes
SR 125 between SR 94 in Spring Valley and I-8 in La Mesa[2]
Major junctions
South end SR 11 / SR 905 in Otay Mesa
Major intersections
North endMission Gorge Road in Santee
Location
CountryUnited States
StateCalifornia
CountiesSan Diego
Highway system
SR 124 SR 126

State Route 125 (SR 125) is a state highway in the U.S. state of California that serves as a north–south route in the San Diego area. It runs from SR 11 and SR 905 in Otay Mesa, near the Mexican border, to SR 52 in Santee. SR 125 also connects SR 54, SR 94, and I-8.

The first parts of SR 125 were added to the state highway system in 1933, connecting Route 94 with US 80. In the 1964 state highway renumbering, what was signed as Route 67 was transferred to the new SR 125. After several delays in funding and in planning, the highway was extended north to SR 52 and south to SR 54 in the early 2000s.

The southern portion of SR 125 from SR 11 and SR 905 to SR 54 near Chula Vista is a toll road called the South Bay Expressway. This portion was completed in 2007 after many years of planning and litigation related to concerns over the destruction of endangered species habitat. The toll road was operated by a public-private partnership known as South Bay Expressway LLC. However, the partnership declared bankruptcy in 2010 and sold the road to the San Diego Association of Governments (SANDAG) in 2011. Since then, following a decrease in the toll amount, traffic using the highway has increased.

The definition of the SR 125 route continues to SR 56, but this portion has not been constructed, and there are no plans to do so.

Route description

[edit]

SR 125 begins as the South Bay Expressway toll road at an interchange with SR 11 and SR 905.[3] The route heads north through an undeveloped area, encountering its first toll plaza just before entering the city of Chula Vista. The freeway cuts through the Eastlake neighborhood of Chula Vista before leaving the city and turning to the northeast, passing through Sweetwater Summit Regional Park near Sweetwater Reservoir. SR 125 intersects with SR 54, where the tolled portion ends. SR 54 runs concurrently with SR 125 north to the Jamacha Road exit. SR 125 continues north again through the unincorporated area of La Presa. The freeway briefly enters Lemon Grove before intersecting with SR 94 and crossing into the city of La Mesa.[4]

Passing to the west of Mount Helix, SR 125 interchanges with I-8 before continuing north through the city of El Cajon near Grossmont College. The freeway continues into suburban Santee, where the route terminates just north of the SR 52 interchange. Traffic can continue onto SR 52 or Mission Gorge Road at the terminus.[4]

SR 125 near Santee, CA

SR 125 is part of the California Freeway and Expressway System,[5] and is part of the National Highway System,[6] a network of highways that are considered essential to the country's economy, defense, and mobility by the Federal Highway Administration.[7] The route is eligible to be included in the State Scenic Highway System,[8] but it is only a scenic highway from SR 94 to I-8 as designated by the California Department of Transportation (Caltrans),[9] meaning that it is a substantial section of highway passing through a "memorable landscape" with no "visual intrusions", where the potential designation has gained popular favor with the community.[10] In 2018, SR 125 had an annual average daily traffic (AADT) of 10,200 vehicles between the Otay River Bridge and Olympic Parkway, and 183,000 vehicles between SR 94 and Lemon Avenue, the latter of which was the highest AADT for the highway.[11]

History

[edit]

Route 67

[edit]

Added to the state highway system in 1933,[12] and defined in 1935,[13] Route 198 extended from US 80 onto La Mesa Boulevard and Palm Avenue to SR 94 by 1938.[14] In 1947, the San Diego County Highway Development Association requested that the highway from Sixth Avenue in Mission Valley to US 80 be constructed as a freeway.[15] Although state senator Fred Kraft criticized the proposal in July 1953 because he believed that it would be too expensive and would not reduce congestion in the long-term, especially around the junction with US 80 in Grossmont,[16] approval for the Route 94 freeway extended to the junction with US 80 by October, with the Grossmont part of the route signed as Route 67.[17] The Route 67 freeway was completed in March 1957, from Campo Road and Route 94 to US 80; the project was completed for $1,625,000[18][19] (about $13 million in 2023 dollars).[20]

Planning and Poway extension

[edit]

Planning for what would become SR 125 north of I-8 began in 1954.[21] Route 282 was defined as a route from Brown Field through La Mesa extending to Route 277 in 1959,[22] and in 1961 the latter terminus was changed to Route 278.[23] The California Highway Commission selected a route for the highway in mid-1963.[24] In the 1964 state highway renumbering, SR 125 was designated as the highway from SR 75 near Brown Field to SR 56. Route 198 was renumbered as SR 67; the portion south of I-8 was renumbered as SR 125.[25]

In early 1964, the La Mesa City Council expressed their preference for Route 282, which had been nicknamed the Ramona Freeway, to run on the routing of Fletcher Parkway, contrary to local businesses that wanted the highway to be routed 0.25 miles (0.40 km) west of the parkway.[26] A few months later, state engineer Jacob Dekema indicated that there were four routes under consideration for the portion from Brown Field to Sweetwater Lake. The project would not be completed until well after 1972.[27] The state had selected a route for that part of the highway by June,[28] and for the routing west of Fletcher Parkway extending to Mission Gorge Road by July.[29] The following year, the California Highway Commission approved a routing north of Mission Gorge Road into Poway and ending at SR 56.[30]

In the 1970s, planning continued for the construction of the route, as well as modifications to the existing roadway. The City of La Mesa began discussions regarding adding SR 125 from SR 94 to I-8 into the scenic highway system in 1968;[31] the county Planning Commission continued pursuing these plans in 1970.[32] SR 125 was lengthened by the Legislature to extend to the Mexican border in 1972.[33] In 1973, then-governor Ronald Reagan vetoed a bill to delete part of SR 125 from state plans, over concerns that not enough transportation studies had been done on the matter.[34][35] An improved interchange with SR 94 was being planned the next year.[36] Soon after, the California Department of Transportation (Caltrans) raised concerns about the remainder of SR 125 not being constructed, due to objections from the community relating to freeway construction in general.[37]

Construction began on the SR 94 interchange in October, and continued into late 1975, at a cost of $11 million (about $48 million in 2023 dollars).[20] Parts of the interchange with SR 94 were open by July 20.[38] The City of Chula Vista considered SR 125 as possibly having scenic value when constructed, and considered asking the state to add it to the state highway system;[39] this influenced a rule that construction projects near possible scenic routes in the city had to take natural aesthetics into account.[40] The La Mesa City Council asked the state to modify the interchange with I-8 in July; the original interchange did not allow for access to SR 125 from I-8 east or to I-8 west from SR 125.[41]

In January of the following year, state Assemblyman Wadie Deddeh proposed legislation to remove the southern portion of SR 125 from the state highway plans again.[42] Soon afterward, the Comprehensive Planning Organization (CPO) moved to support retaining SR 125 from Poway to Santee in the county transportation plan, despite opposition from a county supervisor and the mayor of Escondido.[43] Deddeh's bill passed the state Assembly Transportation Committee a month later; in the meeting, Deddeh noted the construction of I-805 to handle the traffic demands of the region, as well as a lack of funding that would result in the construction being delayed for at least 20 years.[44] Despite a petition from the mayor of Escondido, the CPO again declined to remove SR 125 from the county transportation plan in March.[45]

The new interchange with SR 94 was completed in July 1976.[46] In August, the California Highway Commission (CHC) announced that SR 75 south of SR 54 had been removed from the state highway plan.[47] The next year, the county supervisor, a San Diego City councilman, and the mayors of La Mesa and National City wrote a letter to then-Governor Jerry Brown to ask that this portion of SR 125 and other freeways be constructed. There were concerns about the types of congestion seen in Los Angeles coming to San Diego due to the incomplete freeway system.[48] San Diego City Councilman Tom Gade wrote a telegram to the Caltrans Director Adriana Gianturco about the possible deletions; in response, Gianturco clarified that the plans were only being reconsidered and had not been removed, and a CHC member criticized the tone of the original telegram, calling it "intemperate."[49] However, the city of Chula Vista was opposed to the construction at the time, which was a factor in the removal of SR 125 from the highway plans.[50]

In March 1980, the CPO approved the funding for the redesign of the interchange with I-8.[51] By early 1980, SR 125 was denoted with signs saying "To 94" at Grossmont Summit; plans were to provide access north to Fletcher Parkway in the revamp of the interchange.[52] On December 30, 1980, the City of Poway included SR 56 in the city plan extending east through the city to a northern extension of SR 125.[53]

By 1981, an environmental impact report had been completed on the proposed changes to the I-8 intersection, and the $50 million (about $142 million in 2023 dollars)[20] project to add ramps and widen I-8 was awaiting clearance from the Federal Highway Administration.[54] That year, Poway removed SR 125 from their city plan, leading to a lawsuit from the City of San Diego.[55] In 1983, both the cities of San Diego and Poway supported the extension of SR 56 to SR 67, although the City of Poway wanted the route moved and had reservations about the freeway ending there.[56] The next year, the San Diego Association of Governments (SANDAG) suggested routing SR 125 through the city of Poway, rather than terminating the route further to the south as Poway had requested.[57] Jacob Dekema was asked to advise the city of Poway in the dispute following his departure from the Caltrans district director position.[58]

The proposal to extend SR 125 north into Poway was discussed as late as 2003 by a local advisory group working with the San Diego Association of Governments.[59] The City of Poway opposed the plan in 2001, saying that SR 67 should be improved instead; it had been removed from city plans in 1980.[60] So far, no proposals to extend SR 125 further north have been included in SANDAG's 2050 Regional Transportation Plan.[61]

Construction from SR 52 to SR 54

[edit]

In 1986, the project revamping the I-8 interchange was under way, at a cost of $80 million (about $189 million in 2023 dollars);[20] it would allow for SR 125 to be extended north past I-8 to Fletcher Parkway.[62] That year, SR 125 was truncated to begin at SR 905 by the Legislature, as the latter was formed as a route from I-5 to the border.[63] In 1988, work was under way to add lanes to SR 125 from south of Lemon Avenue to the northern terminus, at a cost of $17.2 million.[64] The next year, some Bonita residents raised objections about the proposed extension south of La Mesa, as they were concerned about additional congestion and urbanization from the freeway going through Bonita.[65]

The California Transportation Commission decided to reallocate the funding for the part of SR 125 from SR 94 to SR 54; they shifted it towards finishing the 40th Street portion of I-15.[66] A year later, the city of Santee expressed concerns about expanding SR 125 and SR 52 to Santee before both those roadways were connected to SR 67, due to the increased traffic that would result. However, Caltrans said this was unavoidable due to a lack of funds to make the connections right away.[67]

La Mesa residents also expressed concerns about the destruction of homes under some of the proposals for the Amaya Drive interchange design,[68] which the city council also endorsed.[69] However, the council approved the construction and design of the Fletcher Parkway interchange in January 1991, over those objections.[21] Further interchange-related concerns were raised from Lemon Grove homeowners the next year.[70] In August 1993, Caltrans agreed to design the new freeway to keep it west of the Sweetwater Reservoir, which satisfied Spring Valley while raising concerns from those living in Bonita, who would be closer to this new routing.[71]

The northern portion of SR 125 would be built in stages, at the same time as the portion south of SR 94. The reconstruction of the interchange with I-8 was completed in April 1993.[72] The construction process began in April 1996, at a cost of $177 million in sales tax revenue.[73] The first phase of the construction of the eastern portion of the SR 54 freeway corresponded with the construction of SR 125 north of Jamacha Boulevard to SR 94; construction began in 1996 at the cost of $313.5 million, using money from sales tax revenue. The plans were to exclude the controversial ramps at Troy and Palm streets.[74] After weather-related construction delays due to the El Niño season of the winter of 1997–1998, as well as a contractor declaring bankruptcy, the extension of SR 52 between Mission Gorge Road and SR 125 was dedicated on May 9, 1998, as well as SR 125 from Mission Gorge Road to Grossmont College Drive.[75]

Others raised some complaints during construction on the freeway south of SR 94. A proposed drainage basin raised concerns about a potential breeding ground for mosquitoes being located near homes.[76] Caltrans was later ordered by local courts to pay settlements in the millions of dollars to local business owners for undervaluing property taken by eminent domain.[77]

The portion from Fletcher Parkway to ramps located at Amaya Drive was finished at the beginning of 2001. The segment north to Navajo Road was due to open later that year, and the part from there to Grossmont College Drive was to begin construction in early 2001.[78]

The H. Lee House, a historic site built in 1928, was relocated by Caltrans for $1.5 million to the City Center Park in Lemon Grove. The portion from SR 94 to Jamacha Boulevard was completed in 2003 for $277 million; at this time, the only part of the freeway from SR 54 to SR 52 not complete was between Navajo Road and Grossmont College Drive. During the construction, residents were inconvenienced by dirt, excess noise, and lights operating at nighttime.[79] The entire freeway from SR 52 to I-8 was completed by mid-2004.[80]

South Bay Expressway

[edit]

Construction

[edit]

Environmental impact studies began on the part of SR 125 south of SR 54 in 1987.[81] In 1990, Caltrans proposed building the southern portion as a toll road, operated by private firms; California Transportation Ventures (CTV) and PrivaCAL both applied for the role.[82] In September, state officials approved this proposal, which was expected to cost $400 million.[83] In the 1991 agreement, Caltrans agreed not to build more than one high-occupancy vehicle lane in each direction on I-805 to reduce competition from SR 125.[84] CTV soon declared that they would be considering many potential routings for the road, including some that Caltrans had declined.[85] The next year, while the company hoped to start the environmental impact study, objections were raised about increased pollution and traffic from the road, as well as the part of the franchise agreement that would allow for the company to collect a settlement if SR 905 was constructed with more than six lanes, since it would compete with the proposed toll road.[86]

The California Transportation Commission agreed to ensure that the southern connection from SR 125 to the new toll road would be funded in May 1996.[87] Much of the routing for SR 125 south of SR 54 was determined in March 1997,[88] and the Federal Highway Administration determined the "San Miguel Connector" routing that would connect the new freeway with SR 54 in August. The selection of the route, due to concerns over the destruction of the habitat of the Least Bell's Vireo, led to objections from county officials due to the proximity to homes and passing through the Bonita Golf Course and a Little League field.[89] CTV spent $14 million on improving parks, and building Little League fields and trails to offset effects of the construction of the road.[90] However, the construction of both SR 125 and Olympic Parkway were considered by Chula Vista officials to be essential for the further development for the eastern part of that city.[91]

Southbound traffic on the South Bay Expressway approaching the bridge over the Otay River.
The Quino checkerspot butterfly, one of the endangered species that was the subject of environmental concerns related to the tollway construction

Concerns about the destruction of the Quino checkerspot butterfly were raised by the community group Preserve South Bay.[92] That group sued the developer as well as Caltrans and SANDAG in August 1999, following the latter's approval for the project.[93] Early the next year, an environmental impact report suggested that Bonita might face negative effects from the freeway, such as noise and having the roadway divide the community.[94] The Federal Highway Administration (FHWA) allowed the project that year, even though the Environmental Protection Agency objected to it.[95] A contractor for the project was soon retained by California Transportation Ventures.[96] Another group, Citizens for 125, obtained 7,000 signatures in support of the road.[97]

However, the San Diego Regional Water Quality Control Board withheld its permit approval in December 2000 over concerns that the Sweetwater Reservoir could be polluted in the process.[98] Such an approval was necessary under the Clean Water Act in order to get the necessary approval from the U.S. Army Corps of Engineers (USACE).[99] The suit by Preserve South Bay was dismissed in March 2001, on the grounds that the legislature did not need to review the annexation of state parkland for the highway because it was done under eminent domain.[100] In April, the San Diego Regional Water Quality Control Board approved the project on several conditions, including monitoring the water quality to ensure that the Sweetwater Reservoir would remain a clean water source for local residents.[101] An appeal to the state Water Resources Control Board to overturn the approval was unsuccessful.[102] In July, the USACE approved the wetlands permit for the southern portion of SR 125.[95]

The Sierra Club and the San Diego National Audubon Society, as well as some other groups, sued the FHWA, USACE, and U.S. Fish and Wildlife Service to block the construction of the toll road over alleged breaches of the Endangered Species Act in October 2001; however, a San Diego judge sided with the contractor and the federal government in March 2003. The developer resolved the environmental concerns for $3.07 million and an agreement to work outside breeding times for the endangered species involved in May of that year. In return, the environmental groups agreed not to appeal the court decision.[103][104] Some community groups also opposed the project.[105]

Construction of the SR 125 toll road started in September 2003; it was projected to open in 2006.[106] Over the next few years, 1.5 million cubic meters of rock were blasted through in 160 separate explosions to allow for the interchange with SR 54 to be built.[107] In 2005, the road was given the South Bay Expressway name.[108] The South Bay Expressway extended SR 125 southward from SR 54 to Otay Mesa. This toll road was one of four privately financed toll highway projects, including the 91 Express Toll Lanes, that were approved in 1990;[109] it was also one of two toll roads financed and controlled by both public and private sources, although the 91 Express Lanes, the other road, soon became entirely publicly owned. A partnership known as the South Bay Expressway operated the road, while an Australian company, Maquarie Group Ltd., handled financial and construction matters.[110]

By 2006, the contractor had encountered delays due to material and worker shortages.[111] The initial toll rates were announced in early 2007, with the lowest toll set at 75 cents.[112] The toll road opened on November 19 of that year. The entire cost of the expressway portion was $843 million, paid for by South Bay Expressway to own the franchise on the tolled portion of SR 125. The interchange with SR 54 was constructed with $160 million of public funding.[113]

Bankruptcy

[edit]

In 2008, 30,000 vehicles a day traveled on the expressway, which fulfilled state expectations;[114] however, complaints were made about the toll machines, due to their low height and needing the exact amount of the toll.[115] In late 2009, the South Bay Expressway partnership that operated the road questioned the value of the toll road for property tax purposes, saying that it was worth $330 million less than it was originally valued due to the low volumes of traffic using the road.[116] On March 22, 2010, the toll road's operator filed for Chapter 11 bankruptcy protection, citing traffic counts running at less than 40 percent of initial estimates due to the economic downturn. Some drivers chose not to use the toll road due to a recent increase in tolls.[117] An editorial in the San Diego Union-Tribune also blamed the delay in opening the toll road and the associated penalties, interest, and legal fees for the company's financial status.[118] According to the bankruptcy filing, the expressway had $510 million of loans outstanding, of which $170 million was owed to the U.S. Department of Transportation. In addition, there was over $600 million of unresolved litigation with the construction contractors. The gross earnings (EBITDA) for the fiscal year ending June 30, 2009 were approximately $3 million on revenues of $21 million.[119]

Discussions regarding a potential SANDAG purchase of the road began in October 2010.[120] On July 29, 2011, SANDAG agreed to purchase the lease of the freeway from South Bay Expressway LLC;[121] even though a study suggested that the agency might have to spend millions of dollars on maintaining and repairing parts of the highway.[122] Objections raised to the purchase during the negotiation phase included needing a loan from the federal government of $1.5 million to complete the purchase, and a possible increase in traffic through Lemon Grove.[123] The sale of the franchise rights until the year 2042 was finalized on December 16, 2011, at a price of $341.4 million, and $10.2 million in additional fees, with $254 million from TransNet sales tax revenue, some of it to be repaid with toll revenue. SANDAG claimed at the time that they would reduce the tolls to attract increased use and decrease traffic on I-805, which would mean that additional lanes would not need to be constructed on that route.[124] Despite this, the operator decided to increase tolls instead even with the low demand for using the road; the San Diego Union-Tribune criticized the decision.[125] In mid-2011, it cost $4 to drive the entire toll portion of the road.[121]

Tolls on the tolled section were reduced in 2012 to 25 to 40 percent less than when the road was privately owned. As a result, the number of vehicles using that particular section increased by 19 percent that year compared to the year before.[126] It was estimated that the road would be fully paid off in 2042, and there were reports of decreased traffic on Chula Vista streets and an increase in retail business.[127]

Proposal to remove tolls

[edit]

In early 2022, Chula Vista mayor Mary Salas said that she hoped to end the toll by 2027 instead of 2042, wanting SANDAG to find a way to pay off the loans by then, stating that it is affecting the economically disadvantaged and driving away companies.[128][129] In April, SANDAG officials reported that the regional body lost up to $1.8 million in revenue when the toll sensors were disabled between June and August 2021.[130]

By July 2022, SANDAG officials announced that they will support eliminating tolls by 2027, but still have to explore ways to pay off the debt.[131]

SR 11 / SR 905 interchange

[edit]

Before being upgraded to a freeway between Britannia Boulevard and Siempre Viva Road, SR 905 directly connected with SR 125 via two at-grade intersections on Otay Mesa Road.[4] When Caltrans opened that segment of the SR 905 freeway in 2010, they omitted the interchange with SR 125, forcing traffic on SR 905 and SR 125 to exit their respective freeways and use Otay Mesa Road (which SR 905 followed at that time) to make the connection. To help fix this problem, a direct freeway-to-freeway interchange was planned, which also included the new SR 11 freeway once it was to be constructed,[132] with construction beginning in late 2015.[133] SR 11 is planned to be a toll facility that will serve a new border crossing east of Otay Mesa.[134] Ramps from SR 905 eastbound to SR 125 northbound, SR 905 westbound to SR 125 northbound, and SR 11 westbound to SR 125 northbound were completed on November 30, 2016, at the cost of over $21 million.[135] Prior to December 16, 2021, traffic on southbound SR 125 was forced to exit onto Otay Mesa Road at that toll road's then southern terminus in order to connect to SR 11 and SR 905.[3] Construction on the ramps for these connections began in 2018,[136] with the ramps from SR 125 southbound to SR 11 eastbound and SR 125 southbound to SR 905 eastbound being completed on December 16, 2021, at the cost of $74 million.[137] The ramp from SR 125 southbound to SR 905 westbound, which was still under construction at the time, was initially scheduled to open to traffic in 2023,[138] but was instead opened to traffic on July 26, 2022, finally completing the interchange.[139] There are no plans to construct the remaining connections from SR 905 westbound to SR 11 eastbound and SR 11 westbound to SR 905 eastbound.

Tolls

[edit]

Tolls along the South Bay Expressway depend on whether a driver uses the FasTrak electronic toll collection system or pays by cash or credit card. It is the last remaining FasTrak facility offering cash payment. Those using the FasTrak transponder pass under open road tolling gantries at all exits and entrances and are charged a prorated toll based on the distance traveled, similar to a toll ticket system used on several turnpikes in the Eastern United States. Drivers paying with cash or credit cards are instead charged a more expensive flat rate depending on which toll booth they pass through, using a barrier toll system. Unstaffed toll plazas with automated cash and credit card machines are located at northbound and southbound off-ramps. Tolls are also collected at the mainline Otay Mesa Toll Plaza near the southern end of the facility just north of Otay Mesa Road.[4] For example, any cash- or credit-paying driver who passes through the Otay Mesa Toll Plaza ends up paying the maximum rate of $3.50 regardless of the distance they traveled.[140]

Drivers without FasTrak, credit cards, or exact change have within four business after using the toll road to make a one-time "Pay-by-Plate" payment online, plus a $2 processing fee, or they will be assessed a toll violation.[141]

The following table lists the toll rates for passenger cars, both with and without FasTrak (as of July 2020). The toll rate is doubled for vehicles with more than two axles.[140]

Southern end of trip Northern end of trip FasTrak Cash/Credit
Otay Mesa Road SR 54 $2.75 $3.50
East H Street $2.00 $3.50
Birch Road, Olympic Parkway, or Otay Lakes Road $1.95 $3.50
Between Birch Road and East H Street $0.50 $2.50
Birch Road, Olympic Parkway, Otay Lakes Road, or East H Street SR 54 $1.70 $2.50
San Miguel Ranch Road $1.55 $2.00

Exit list

[edit]

The entire route is in San Diego County.

Locationmi[1][142]kmExit
[142]
DestinationsNotes
Otay Mesa0.000.00 SR 11South end of SR 125; SR 11 west exit 1A

SR 905 east / Siempre Viva Road – International Border
Future I-905 east; SR 905 west exit 8

SR 905 west
Future I-905 west; SR 905 east exit 8
1.061.711Otay Mesa RoadSouthbound exit and northbound entrance; former SR 905
San Diego1.712.75Otay Mesa Toll Plaza (FasTrak, cash or credit card)
Chula Vista4.877.845Birch RoadFasTrak gantry, all ramps; unstaffed cash/credit card machines at southbound exit and northbound entrance
5.659.096Olympic ParkwayFasTrak gantry, all ramps; unstaffed cash/credit card machines at southbound exit and northbound entrance
6.6310.677Otay Lakes RoadFasTrak gantry, all ramps; unstaffed cash/credit card machines at southbound exit and northbound entrance
7.6712.348East H StreetFasTrak gantry, all ramps; unstaffed cash/credit card machines at southbound exit and northbound entrance
8.6413.909San Miguel Ranch Road, Mt. Miguel RoadSouthbound exit and northbound entrance (FasTrak, unstaffed cash/credit card machine)
FasTrak toll gantry[143]
11.7418.8911A
SR 54 west (South Bay Freeway)
SR 125 north follows exit 11B; SR 125 south follows SR 54 west exit 6; last free exit for southbound traffic
12.3919.9412Jamacha Boulevard, Paradise Valley Road (CR S17)CR S17 is former SR 54 east
13.1121.1013Jamacha Road
Lemon Grove15.42–
15.98
24.82–
25.72
15 SR 94 (Martin Luther King Jr. Freeway)Southbound exit to SR 94 east is via exit 16; SR 94 exits 9A-B
La Mesa15.9825.7216Spring Street – La MesaNorthbound exit is via SR 94 east
16.8427.1016Lemon AvenueNorthbound exit and southbound entrance
17.5828.2918AGrossmont Boulevard
17.9028.8118B I-8I-8 westbound exit 14B, eastbound exit 14A
18.3129.4718CFletcher Parkway
El Cajon19.6331.5920ANavajo Road
20.2832.6420BGrossmont College Drive
Santee22.0635.5022 SR 52 – San Diego, SanteeNorth end of SR 125; former exit 21
22.3035.89Mission Gorge RoadAt-grade intersection
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

[edit]

References

[edit]
  1. ^ a b California Department of Transportation (2016). Postmile Services (Map). California Department of Transportation. Retrieved September 12, 2016.
  2. ^ California Department of Transportation (August 2019). "Officially Designated State Scenic Highways and Historic Parkways" (XLSX). Sacramento: California Department of Transportation. Retrieved March 27, 2019.
  3. ^ a b "California State Route 125" (Map). Google Maps. Retrieved July 28, 2022.
  4. ^ a b c d Thomas Brothers (2009). San Diego County Road Atlas (Map). 1:22,800. Chicago: Rand McNally. pp. 1231, 1251, 1271, 1291, 1311, 1331, 1351.
  5. ^ "Article 2 of Chapter 2 of Division 1". California Streets and Highways Code. Sacramento: California Office of Legislative Counsel. Retrieved February 6, 2019.
  6. ^ Federal Highway Administration (March 25, 2015). National Highway System: San Diego, CA (PDF) (Map). Scale not given. Federal Highway Administration. Archived from the original (PDF) on July 3, 2015. Retrieved May 25, 2015.
  7. ^ Natzke, Stefan; Neathery, Mike & Adderly, Kevin (June 20, 2012). "What is the National Highway System?". National Highway System. Washington, DC: Federal Highway Administration. Retrieved July 2, 2015.
  8. ^ "Article 2.5 of Chapter 2 of Division 1". California Streets & Highways Code. Sacramento: California Office of Legislative Counsel. Retrieved February 6, 2019.
  9. ^ California Department of Transportation (August 2019). "Officially Designated State Scenic Highways and Historic Parkways" (XLSX). Sacramento: California Department of Transportation. Retrieved July 2, 2015.
  10. ^ California Department of Transportation (2012). Scenic Highway Guidelines (PDF). Sacramento: California Department of Transportation. p. 5. Retrieved June 8, 2017.
  11. ^ California Department of Transportation (2017). "All Traffic Volumes on CSHS". Sacramento: California Department of Transportation. Retrieved November 25, 2018.
  12. ^ California State Assembly. "An act to amend sections 2, 3 and 5 and to add two sections to be numbered 6 and 7 to an act entitled 'An act to provide for the acquisition of rights of way for and the construction, maintenance..." Fiftieth Session of the Legislature. Statutes of California. State of California. Ch. 767 p. 2034–2042.
  13. ^ California State Assembly. "An act to establish a Streets and Highways Code, thereby consolidating and revising the law relating to public ways and all appurtenances thereto, and to repeal certain acts and parts of acts specified herein". Fifty-first Session of the Legislature. Statutes of California. State of California. Ch. 29 p. 287.
  14. ^ California Division of Highways (1938). Road Map of the State of California (Map). Scale not given. Sacramento: California Division of Highways. San Diego inset. Retrieved July 3, 2015.
  15. ^ "Highway Needs Restatement Asked by Group". The San Diego Union. July 1, 1947. p. 4A.
  16. ^ "Sen. Kraft Opposes Freeway 94 Route". The San Diego Union. July 25, 1953. p. A11. OCLC 13155544.
  17. ^ Dekema, J. (November–December 1955). "Freeways in District XI". California Highways and Public Works. 34 (11–12): 5–7.
  18. ^ Luckenback, R.B.; Smith, C.; Estep, Al (July–August 1957). "San Diego Freeways". California Highways and Public Works. 35 (7–8): 45.
  19. ^ Dekema, Jacob (November–December 1958). "Report from District XI". California Highways and Public Works. 37 (11–12): 46.
  20. ^ a b c d Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
  21. ^ a b Wolf, Leslie (January 25, 1991). "La Mesa Council Approves Plans for Interchange on 125 Extension". Evening Tribune. San Diego. p. B12.
  22. ^ California State Assembly. "An act to amend Sections 306, 320, 332, 351, 362, 365, 369, 374, 382, 388, 397, 407, 408, 409, 410, 415, 422, 435, 440, 446, 453, 456, 460, 467, 470, 476, 487, 492, 493, 494, 506, 521, 528, and 529..." 1959 Session of the Legislature. Statutes of California. State of California. Ch. 1062 p. 3121.
  23. ^ California State Assembly. "An act to amend Sections 253, 305, 308, 315, 316, 323, 326, 343, 354, 366, 368, 376, 399, 414, 415, 416, 468, 512, 513, 526, 572, 582, and 587, to amend and renumber Section 559, and to repeal Section 725.5..." 1961 Session of the Legislature. Statutes of California. State of California. Ch. 1146 p. 2892.
  24. ^ "Midway Freeway Route is Adopted". The San Diego Union. July 24, 1963. p. A17.
  25. ^ California State Assembly. "An act to add Section 253 and Article 3 (commencing with Section 300) to Chapter 2 of Division 1 of, and to repeal Section 253 and Article 3 (commencing with Section 300) of Chapter 2 of Division 1 of, the..." 1963 Session of the Legislature. Statutes of California. State of California. Ch. 385 p. 1182.
  26. ^ "La Mesa Backs Freeway Route Near Parkway". The San Diego Union. January 31, 1964. p. A20.
  27. ^ "Public, Experts Eye 4 Freeway Plans". The San Diego Union. March 24, 1964. p. A18.
  28. ^ "State Proposes Freeway Route in South Bay". The San Diego Union. June 28, 1964. p. B3.
  29. ^ "Womack Backs Westerly Route for Freeway". The San Diego Union. July 31, 1964. p. A20.
  30. ^ "Revised Area Freeway OKd". The San Diego Union. July 22, 1965. p. A15.
  31. ^ Stone, Joe (November 10, 1968). "La Mesa to Study Scenic Route Plan". The San Diego Union. p. B3.
  32. ^ "State 125 Scenic Corridor Urged". The San Diego Union. November 6, 1970. p. B1.
  33. ^ California State Assembly. "An act to amend Sections 263.3, 263.8, and 415 of, and to add Section 486 to, the Streets and Highways Code, relating to state highways". 1972 Session of the Legislature. Statutes of California. State of California. Ch. 1216 p. 2351.
  34. ^ "Freeway Priority Set Low". The San Diego Union. July 6, 1974. p. B3.
  35. ^ "Legislation to Cut Road Project by 10 Miles Planned". The San Diego Union. December 25, 1974. p. B6.
  36. ^ "Bid Opening Set on State 94". The San Diego Union. June 21, 1974. p. B2. OCLC 13155544.
  37. ^ "Public's Mood Shifts Away From Freeways". The San Diego Union. January 8, 1974. p. X16.
  38. ^ "New State 94 Interchange is Open". The San Diego Union. July 20, 1976. p. B3. OCLC 13155544.
  39. ^ Staff (January 19, 1974). "Chula Vista Scenic Roads Plan Studied". The San Diego Union. p. B2.
  40. ^ Staff (May 26, 1974). "Scenic Route Plan OK Voted". The San Diego Union. p. B3.
  41. ^ Staff (July 25, 1974). "City Asks Interchange Construction". The San Diego Union. p. B3. OCLC 13155544.
  42. ^ Staff (January 18, 1975). "Poll Asks Stand on State 125". The San Diego Union. p. B3.
  43. ^ "CPO Backs Freeway Plan". The San Diego Union. January 21, 1975. p. B3.
  44. ^ Staff (February 5, 1975). "Assembly Unit Cuts Work on State 125". The San Diego Union. p. B8.
  45. ^ Harrison, Donald (March 18, 1975). "CPO Selects Otay Mesa Site for Future Regional Airport". The San Diego Union. p. B1.
  46. ^ "New State 94 Interchange is Open". The San Diego Union. July 20, 1976. p. B3.
  47. ^ "Plans for 10-Mile State Highway to Border Eliminated". The San Diego Union. August 10, 1976. p. B3.
  48. ^ "Added Freeway Projects Sought". The San Diego Union. April 26, 1977. p. B4.
  49. ^ Harrison, Donald (July 24, 1977). "State Aide Protests Gade Words". The San Diego Union. p. H16.
  50. ^ Preble, Laura (September 4, 1987). "Growth Spurs New Look at Route 125 Plan". Evening Tribune. San Diego. p. B10.
  51. ^ "CPO Approves $1 Billion Rail, Road Program". The San Diego Union. March 18, 1980. p. B2.
  52. ^ Spiller, Virginia (March 24, 1980). "Key Road Project in La Mesa". The San Diego Union. p. B2.
  53. ^ Taylor, Rivian (December 31, 1980). "Poway Council Includes Route 56 in General Plan". The San Diego Union. p. 3. OCLC 13155544.
  54. ^ Staff (May 20, 1981). "Interchange Project Nears Green Light". The San Diego Union. p. B3. OCLC 13155544.
  55. ^ Kozub, Linda (February 7, 1985). "Poway Officials Ask San Diego Aid on Traffic Problems". The San Diego Union. p. B3.
  56. ^ Pimentel, Ricardo (January 20, 1983). "San Diego, Poway Back Proposed Freeway". The San Diego Union. p. B3. OCLC 13155544.
  57. ^ Kozub, Linda (July 11, 1984). "Road Proposed Through Poway". The San Diego Union. p. B3.
  58. ^ Kozub, Linda (February 21, 1985). "Poway Council Hires Ex-Caltrans Official". The San Diego Union. p. B3.
  59. ^ Ristine, Jeff (December 13, 2003). "Old Ideas Come Round for Travelling North–South". San Diego Union-Tribune. p. NC-2.
  60. ^ Clark, Brian (February 8, 2001). "Poway Resisting SANDAG Ideas for Route 125". San Diego Union-Tribune. p. NI1.
  61. ^ "SANDAG 2050 Regional Transportation Plan". San Diego Association of Governments. October 28, 2011. Archived from the original on July 31, 2013. Retrieved June 12, 2015.
  62. ^ Taylor, Kathie (December 5, 1986). "Detour-sign watchers have field day at interchange". Evening Tribune. San Diego. p. B22. OCLC 37687666.
  63. ^ California State Assembly. "An act to amend Sections 318, 341, 343, 360, 366, 370, 374, 388, 389, 403, 425, 468, 548, 624, 2104, and 2107 of, to add Section 632 to, and to repeal Sections 322.1, 355.1, 417, and 622.2 of, the Streets..." 1985–1986 Session of the Legislature. Statutes of California. State of California. Ch. 928 p. 3215–3216.
  64. ^ Hughes, Joe (April 9, 1988). "Building Boom Tangles Drivers in 50 Projects". Evening Tribune. San Diego. p. A1.
  65. ^ De Salvo, Steven (January 13, 1989). "Bonita Residents Fear Freeway Will Shatter Their Peace, Quiet". Evening Tribune. San Diego. p. B1.
  66. ^ Carson, Daniel (September 20, 1990). "Funds for State 125 Shifted to I-15 Link". The San Diego Union. p. B5.
  67. ^ Harpster, David (March 30, 1990). "City Fears Giant Gridlock When Two Freeways Linked to Santee". Evening Tribune. San Diego. p. B3.
  68. ^ LePage, Andrew (June 1, 1990). "Route 125 Plan Needs Brakes, La Mesans Say". Evening Tribune. San Diego. p. B18.
  69. ^ Kucher, Karen (July 26, 1990). "Score One for Foes of Interchange". Evening Tribune. San Diego. p. B1.
  70. ^ Sevilla, Graciella (February 20, 1992). "Caltrans Offers New Option for Highway Past Lemon Grove". San Diego Union-Tribune. p. B1.
  71. ^ Jahn, Ed (August 14, 1993). "Route 125 East Plans Erased By Caltrans". San Diego Union-Tribune. p. B4.
  72. ^ Jahn, Ed (April 16, 1993). "Link of I-8, 125 Opens". San Diego Union-Tribune. p. B1.
  73. ^ Balint, Kathryn (April 3, 1996). "Work on New Stretch of 125 to Start Today". San Diego Union-Tribune. p. B2.
  74. ^ Barfield, Chet (August 1, 1996). "Building begins on Route 125 segment". San Diego Union-Tribune. p. B7.
  75. ^ Arner, Mark (May 8, 1998). "New freeway between Santee and La Mesa to be opened in stages". San Diego Union-Tribune. p. B4. OCLC 25257675.
  76. ^ Arner, Mark (October 23, 1998). "Lemon Grove to Caltrans: You're a Lousy Neighbor". San Diego Union-Tribune. p. B1.
  77. ^ Callahan, Bill (August 5, 1998). "Jury Tells Caltrans to Pay $2.7 Million to Ousted Firm". San Diego Union-Tribune. p. B1.
  78. ^ "Stretch of Route 125 to Open Today, Others Later". San Diego Union-Tribune. January 3, 2001. p. B2.
  79. ^ Krueger, Anne (May 7, 2003). "Route 125 Connection". San Diego Union-Tribune. p. B1.
  80. ^ Ristine, Jeff (July 11, 2004). "Is Tax Near End of Road?". San Diego Union-Tribune. p. B1.
  81. ^ Staff (November 21, 1987). "Impact of 4 Alternative State 125 Routes Studied". The San Diego Union. p. B4.
  82. ^ Sevilla, Graciella; Carson, Dan (August 3, 1990). "Highway Receives Support, But Toll Chills Enthusiasm". San Diego Union. p. B3.
  83. ^ Roach, Ron; Taylor, Kathie (September 14, 1990). "State Says Otay Freeway Will Be Unique Toll Road". Evening Tribune. San Diego. p. A1.
  84. ^ Ristine, Jeff (May 31, 2005). "Company Seeks More Time to be Owner of SR-125 Toll Road". San Diego Union-Tribune. p. B2.
  85. ^ Heffernan, Lillian (October 22, 1990). "Routes Eyed for Toll Road in S. County". Evening Tribune. San Diego. p. B5.
  86. ^ Weisberg, Lori (March 3, 1991). "Consortium Facing Bumpy Path in Promoting Toll Road". San Diego Union. p. B2.
  87. ^ Mendel, Ed (May 2, 1996). "Commission Toils Over Funding for New Toll Roads". San Diego Union-Tribune. p. B2.
  88. ^ Arner, Mark (March 5, 1997). "Plans to Extend Route 125 Advance". San Diego Union-Tribune. p. B1.
  89. ^ Arner, Mark (August 13, 1997). "U.S., State Choice of Route for Toll Road Angers County". San Diego Union-Tribune. p. B3.
  90. ^ McMahon, Shannon (March 4, 2006). "Route 125 on Track for '07 Completion". San Diego Union-Tribune. p. B1.
  91. ^ Monteagudo Jr., Luis (December 25, 1999). "Chula Vista Planners Uneasy at Pace of Growth". San Diego Union-Tribune. p. B3.
  92. ^ Arner, Mark (May 10, 1999). "Butterfly Flutters Into Path of Toll Road". San Diego Union-Tribune. p. B2.
  93. ^ Arner, Mark (August 24, 1999). "Tollway Foes Sue to Block Work on Connecting Road". San Diego Union-Tribune. p. B3.
  94. ^ Arner, Mark (February 17, 2000). "Toll Road's Environmental Score Mixed". San Diego Union-Tribune. p. B1.
  95. ^ a b Vigil, Jennifer (July 28, 2001). "South Part of State Route 125 Gets an OK". San Diego Union-Tribune. p. B1.
  96. ^ Oakes, Amy (October 12, 2000). "Contractor Hired for Tollway". San Diego Union-Tribune. p. B7.
  97. ^ Oakes, Amy (December 5, 2000). "7,000 Sign On for Route 125 Extension". San Diego Union-Tribune. p. B2.
  98. ^ Vigil, Jennifer (December 15, 2000). "Pollution Agency Denies Permit for Route 125 Plan". San Diego Union-Tribune. p. B1.
  99. ^ Vigil, Jennifer (April 9, 2001). "Key Water Quality OK Pending for Route 125". San Diego Union-Tribune. p. B1.
  100. ^ Vigil, Jennifer (March 17, 2001). "Route 125 Opponents Lose Their Lawsuit". San Diego Union-Tribune. p. B2.
  101. ^ Vigil, Jennifer (April 24, 2001). "Board Backs Route 125, But With Strict Conditions". San Diego Union-Tribune. p. B2.
  102. ^ Vigil, Jennifer; Oakes, Amy (June 30, 2001). "OK of Route 125 Tollway is Nearer as Appeal Denied". San Diego Union-Tribune. p. B4.
  103. ^ Oakes, Amy (May 14, 2003). "State Route 125 Foes Make a Deal to End Long Fight". San Diego Union-Tribune. p. B1.
  104. ^ Vigil, Jennifer (April 23, 2003). "Work on State Route 125 Set to Begin". San Diego Union-Tribune. p. B2.
  105. ^ Luzzaro, Susan (November 18, 2009). "Nine Miles of Nothing". San Diego Reader. Retrieved September 13, 2014.
  106. ^ Oakes, Amy (September 13, 2003). "Work on Southern Part of Route 125 Starts After Years of Delay". San Diego Union-Tribune. p. B10.
  107. ^ Graham, David (March 5, 2007). "Route 54 bridge blasting complete". San Diego Union-Tribune. p. B3.
  108. ^ "Toll Road is Named S Bay Expressway". San Diego Union-Tribune. July 23, 2005. p. B2.
  109. ^ Roach, Ron (September 15, 1990). "State Approves Toll Highway for Otay Mesa". Evening Tribune. San Diego. p. B1.
  110. ^ Fry, Wendy; Hawkins, Robert J. (April 13, 2011). "SANDAG to Buy Bankrupt South Bay Expressway?". San Diego Union-Tribune (Web ed.) – via America's Newspapers.
  111. ^ Mannes, Tanya (November 1, 2006). "Toll Roads Through Chula Vista Taking Shape". San Diego Union-Tribune. p. B1.
  112. ^ Mannes, Tanya (February 6, 2007). "12-mile South Bay Tollway Nears Completion". San Diego Union-Tribune. p. B1.
  113. ^ Schmidt, Steve (November 20, 2007). "Drivers Say Tollway is on Road to Success". San Diego Union-Tribune. p. B1.
  114. ^ Schmidt, Steve (May 5, 2008). "Tollway is Meeting Officials' Expectations". San Diego Union-Tribune. p. B1.
  115. ^ Schmidt, Steve (January 20, 2008). "Toll Collection Machines Draw Complaints". San Diego Union-Tribune. p. B1.
  116. ^ "The Unused Toll Road". San Diego Union-Tribune. December 5, 2009. p. B6.
  117. ^ Schmidt, Steve (March 23, 2010). "Toll Road Operator Files for Chapter 11". San Diego Union-Tribune. p. A1.
  118. ^ "Speed Bump for a Toll Road". San Diego Union-Tribune. March 26, 2010. p. B6.
  119. ^ "Declaration in Support of Chapter 11 Petition and First Day Motions" (PDF). March 22, 2010. pp. 8, 12. Archived from the original (PDF) on July 4, 2015. Retrieved July 3, 2015.
  120. ^ Hawkins, Robert J. (October 6, 2010). "SANDAG to Consider Taking Over Toll Road". San Diego Union-Tribune. p. B2.
  121. ^ a b Max, Nathan (July 30, 2011). "SANDAG Agrees to Buy SR-125 Toll Road". San Diego Union-Tribune. p. B1. Retrieved July 30, 2011.
  122. ^ McDonald, Jeff (November 18, 2011). "Report Cites Concerns in Plan to Buy Toll Road". San Diego Union-Tribune. p. B1.
  123. ^ Hawkins, Robert J. (December 3, 2011). "Concerns Remain on South Bay Toll Road Purchase". San Diego Union-Tribune. p. B1.
  124. ^ Hawkins, Robert J. (December 16, 2011). "SANDAG Agrees to Purchase South County Toll Road". San Diego Union-Tribune. p. A1. Retrieved March 4, 2012.
  125. ^ "Lowering Tolls on a Road Less Traveled". U-T San Diego. May 25, 2012. p. B6.
  126. ^ Fry, Wendy (July 17, 2012). "Chula Vista Toll Decreases, Traffic Increases". NBC San Diego. Archived from the original on July 4, 2015. Retrieved July 22, 2012.
  127. ^ Poythress, Katherine (December 27, 2012). "Payoff Plans for South Bay Expressway on Track". U-T San Diego. p. SZ3.
  128. ^ Little, Joe (January 21, 2022). "Chula Vista Mayor Wants to Do Away With Toll on South Bay Expressway". San Diego: KNSD. Archived from the original on January 23, 2022. Retrieved April 20, 2022.
  129. ^ Encinas, Ciara (February 7, 2022). "A push to end South Bay's only toll road on State Route 125 by 2027". San Diego: KGTV. Archived from the original on February 8, 2022. Retrieved April 20, 2022.
  130. ^ Gotfredson, David (April 19, 2022). "South Bay toll stations disconnected for months, SANDAG loses $1.8M". Chula Vista: KFMB-TV. Archived from the original on April 20, 2022. Retrieved April 20, 2022.
  131. ^ "SANDAG declares support for clearing debt to eliminate State Route 125 toll". San Diego Union-Tribune. July 8, 2022.
  132. ^ Kuhney, Jen (July 19, 2012). "New Freeway Segment at Border Celebrated". U-T San Diego. p. B2.
  133. ^ City News Service (October 26, 2015). "Construction Begins On Otay Mesa Border Freeway Connection". KPBS. San Diego. Retrieved January 16, 2016.
  134. ^ Hawkins, Robert J. (January 11, 2011). "Hearing Set on Border Highway and Crossing". San Diego Union-Tribune. p. B2. Retrieved February 20, 2016.
  135. ^ Stewart, Joshua (November 30, 2016). "New roads between border, South Bay Highways, completed". The San Diego Union-Tribune. Jeff Light.
  136. ^ "SR 905/SR 125/SR 11 Northbound Connectors Project Fact Sheet" (PDF). Caltrans website. California Department of Transportation. October 2016. Retrieved May 30, 2017.
  137. ^ Mendoza, Alexandra (December 17, 2021). "New freeway connectors set stage for Otay Mesa East border project". The San Diego Union-Tribune. Jeff Light. Retrieved May 11, 2022.
  138. ^ Meyer, Matt; Sarkissian, Jacqueline (December 16, 2021). "New freeway ramps make it easier to reach border, future port of entry". Nexstar Media Group. KSWB-TV. Retrieved May 11, 2022.
  139. ^ Jennewein, Chris (July 26, 2022). "Key Freeway Connection Opens in Otay Mesa, Improving Cross-Border Travel". Times of San Diego. Retrieved July 27, 2022.
  140. ^ a b "South Bay Expressway Toll Schedule" (PDF). San Diego Association of Governments. July 2020. Retrieved July 16, 2022.
  141. ^ "Our Roadways". San Diego Association of Governments. Retrieved August 14, 2022.
  142. ^ a b Saif, Faizah (September 27, 2018). "California Numbered Exit Uniform System" (PDF). Sacramento: California Department of Transportation. Retrieved February 15, 2020.
  143. ^ "FasTrak electronic toll gantry south of SR 54" (Map). Google Maps. Retrieved April 19, 2020.
[edit]
KML is from Wikidata